Melissa Brandt
Melissa Brandt · CEO@OCANC.com
Emoni Burgess
Emoni Burgess · OPS@OCANC.com
Aerial map of Camp Davis Industrial Park in Holly Ridge, North Carolina, with the park boundary outlined in gold along four-lane US Highway 17
Back to Site Selection
Next PhaseHolly Ridge · Onslow County, NC

Camp Davis Industrial Park — Phase III

At the corner of four-lane US Highway 17 and NC Highway 50 in Holly Ridge, adjacent to Gulfstream Steel and Onslow Bay Boatworks — under an hour to the Port of Wilmington and 25 minutes to I-40.

At a glance
The next phase of a park whose first two phases sold out.
In development Holly Ridge
Water Sewer Electric Natural gas

In the park: Gulfstream Steel & Supply · Onslow Bay Boatworks · Atlantic Seafood

Section 01

Site & jurisdiction

Address
301 US Highway 17 South, Holly Ridge, Onslow County, NC 28445
Jurisdiction
Town of Holly Ridge, Onslow County
Zoning
Light Industrial
Direct access
Direct frontage on four-lane US Highway 17 at NC Highway 50
Traffic count
22,000 vehicles per day on US Highway 17 at the park
Acreage & lot layout
In planning — confirm with Onslow Coastal Alliance (OCA)
Site control
Onslow Coastal Alliance (OCA)
Pricing
Confirm current terms with Onslow Coastal Alliance (OCA)
Section 02

Utilities & infrastructure

Water
Public water, stubbed to the curb at each parcel in prior phases
Wastewater
Municipal sewer, stubbed to the curb at each parcel in prior phases
Electric
Duke Energy
Natural gas
Natural gas on site within the park
Telecom / fiber
Confirm carrier and fiber availability with Onslow Coastal Alliance (OCA)
Water & sewer capacity (GPD)
Available on request
Section 03

Access & drive distances

US Highway 17 (four-lane)
Direct frontage
Interstate 40
25 minutes by four-lane highway
Port of Wilmington
36 mi — under 1 hour
Wilmington International Airport
40 mi
Albert J. Ellis Airport
30 mi
Rail (nearest)
30 mi — CSX, Wilmington
Section 04

Due diligence completed

Prior-phase precedent
Phase II was delivered fully permitted and shovel ready by the Town of Holly Ridge
Projected impact (Phase II)
Forecast at 235 new jobs and $22.5M added to the county tax base
Phase III permitting
In progress — confirm current status with Onslow Coastal Alliance (OCA)
Wetlands, geotech, environmental
Confirm current status with Onslow Coastal Alliance (OCA)
Next step

Request the full package for Camp Davis III.

Send us your acreage, power, water, and timeline requirements. We'll return current parcel availability, utility capacity, incentive estimates, and workforce data — confidentially, and usually within two business days.

Zoning detail

Permitted uses — CDIP Overlay District

The Camp Davis Industrial Park (CDIP) Overlay accommodates a wide range of assembling, fabricating, manufacturing, and distribution activities. Uses below are drawn from the Town of Holly Ridge Table of Permitted Uses (Zoning Ordinance Section 7-3-26) as amended in 2024 to expand development options in Phase II.

Established overlay uses

  • Asphalt products manufacturing
  • Bottling plants
  • Concrete products production
  • Metal machining, welding and fabrication shop
  • Metal machining, welding and fabrication plant
  • Motor vehicle manufacturing
  • Paving and grading operation
  • Woodworking fabrication shop / plant
  • Refinery
  • Wholesale distribution
  • Liquor store (ABC store)
  • Microbrewery or microdistillery
  • Meatpacking and poultry processing plant
  • Processing plant (food)
  • Accessory structure / use
  • Wireless communication facility, small cell / collocation

Uses added by the 2024 text amendment

  • Boat repairs, sales, and service
  • Industrial supplies and equipment sales
  • Monument works / sales
  • Mobile vendor
  • Truck, farm equipment, heavy equipment sales and service
  • Blacksmith operations
  • Contractor's office
  • Heating and refrigeration repair shop
  • Fire and Rescue (EMS)
  • Police department
  • Truck / freight terminal (6 or fewer trucks)
  • Truck / freight terminal (more than 6 trucks)
Download Town of Holly Ridge staff report — TA-2024-02 CDIP permitted uses (PDF)

Source: Town of Holly Ridge Community Development Department. Confirm current use status with the Town before acquisition or design; Onslow Coastal Alliance (OCA) can coordinate a pre-application review.