
A single light industrial lot inside Camp Davis Phase II — graded, permitted, with water, sewer, electric, and natural gas already stubbed to the curb. Priced at $125,000 per acre.
In the park: Gulfstream Steel & Supply · Onslow Bay Boatworks · Atlantic Seafood
Send us your acreage, power, water, and timeline requirements. We'll return current parcel availability, utility capacity, incentive estimates, and workforce data — confidentially, and usually within two business days.
Aerials from the Town of Holly Ridge marketing package for Camp Davis Industrial Park Phase II.



Zoning detail
The Camp Davis Industrial Park (CDIP) Overlay accommodates a wide range of assembling, fabricating, manufacturing, and distribution activities. Uses below are drawn from the Town of Holly Ridge Table of Permitted Uses (Zoning Ordinance Section 7-3-26) as amended in 2024 to expand development options in Phase II.
Source: Town of Holly Ridge Community Development Department. Confirm current use status with the Town before acquisition or design; Onslow Coastal Alliance (OCA) can coordinate a pre-application review.