Melissa Brandt
Melissa Brandt · CEO@OCANC.com
Emoni Burgess
Emoni Burgess · OPS@OCANC.com
County GIS aerial map of Camp Davis Industrial Park Phase II with the 1.73-acre Lot 17 highlighted in gold at the end of Betty Taylor Wood Road — Holly Ridge, North Carolina
Back to Site Selection
1.73 AcresHolly Ridge · Onslow County, NC

Lot 17 — Camp Davis Industrial Park Phase II

A single light industrial lot inside Camp Davis Phase II — graded, permitted, with water, sewer, electric, and natural gas already stubbed to the curb. Priced at $125,000 per acre.

At a glance
A right-sized 1.73-acre lot in a fully permitted, shovel-ready park.
Shovel-ready Holly Ridge1.73 acres
Water Sewer Electric Natural gas

In the park: Gulfstream Steel & Supply · Onslow Bay Boatworks · Atlantic Seafood

Section 01

Site & jurisdiction

Address
1001 Betty Taylor Wood Road, Holly Ridge, Onslow County, NC 28445
Jurisdiction
Town of Holly Ridge, Onslow County
Zoning
Light Industrial
Lot acreage
1.73 acres
Direct access
Frontage on Betty Taylor Wood Road (public, built to Town standards); 0.3 mi to four-lane US Highway 17 via Mabel Rawlinson Drive
Delivery condition
Fully permitted and shovel ready at delivery
Max impervious coverage
75,359 SF
Site control
Town of Holly Ridge
Pricing
$216,250 ($125,000/acre)
Section 02

Utilities & infrastructure

Water
Public water, stubbed to the curb
Wastewater
Municipal sanitary sewer, stubbed to the curb
Electric
Duke Energy
Natural gas
Natural gas on site within the park
Stormwater
Park stormwater structures constructed as part of Phase II
Telecom / fiber
Confirm carrier and fiber availability with Onslow Coastal Alliance (OCA)
Water & sewer capacity (GPD)
Available on request
Section 03

Access & drive distances

US Highway 17 (four-lane)
0.3 mi via Mabel Rawlinson Drive
Interstate 40
25 minutes by four-lane highway
Port of Wilmington
36 mi — under 1 hour
Wilmington International Airport
40 mi
Albert J. Ellis Airport
30 mi
Rail (nearest)
30 mi — CSX, Wilmington
Section 04

Due diligence completed

Permitting
Phase II construction fully permitted by the Town of Holly Ridge
Grading & infrastructure
Grading, stormwater, water, sewer, and road construction complete
Signalization
Future traffic signal at US Highway 17 & Mabel Rawlinson Drive approved
Wetlands, geotech, environmental
Complete
Boundary survey
Complete
Next step

Request the full package for Lot 17 · Camp Davis II.

Send us your acreage, power, water, and timeline requirements. We'll return current parcel availability, utility capacity, incentive estimates, and workforce data — confidentially, and usually within two business days.

Site imagery

Aerials from the Town of Holly Ridge marketing package for Camp Davis Industrial Park Phase II.

Aerial view of Camp Davis Industrial Park Phase II looking across the graded pads toward US Highway 17 in Holly Ridge, North Carolina
Graded park interior with US Highway 17 frontage in the background
Aerial view of finished building pads and internal roads inside Camp Davis Industrial Park Phase II
Finished pads, internal roads, and utilities in place
Aerial of Camp Davis Industrial Park Phase II with US Highway 17 frontage carrying 26,500 vehicles per day
US Highway 17 frontage — 26,500 vehicles per day
Download Camp Davis Phase II marketing package (PDF)

Zoning detail

Permitted uses — CDIP Overlay District

The Camp Davis Industrial Park (CDIP) Overlay accommodates a wide range of assembling, fabricating, manufacturing, and distribution activities. Uses below are drawn from the Town of Holly Ridge Table of Permitted Uses (Zoning Ordinance Section 7-3-26) as amended in 2024 to expand development options in Phase II.

Established overlay uses

  • Asphalt products manufacturing
  • Bottling plants
  • Concrete products production
  • Metal machining, welding and fabrication shop
  • Metal machining, welding and fabrication plant
  • Motor vehicle manufacturing
  • Paving and grading operation
  • Woodworking fabrication shop / plant
  • Refinery
  • Wholesale distribution
  • Liquor store (ABC store)
  • Microbrewery or microdistillery
  • Meatpacking and poultry processing plant
  • Processing plant (food)
  • Accessory structure / use
  • Wireless communication facility, small cell / collocation

Uses added by the 2024 text amendment

  • Boat repairs, sales, and service
  • Industrial supplies and equipment sales
  • Monument works / sales
  • Mobile vendor
  • Truck, farm equipment, heavy equipment sales and service
  • Blacksmith operations
  • Contractor's office
  • Heating and refrigeration repair shop
  • Fire and Rescue (EMS)
  • Police department
  • Truck / freight terminal (6 or fewer trucks)
  • Truck / freight terminal (more than 6 trucks)
Download Town of Holly Ridge staff report — TA-2024-02 CDIP permitted uses (PDF)

Source: Town of Holly Ridge Community Development Department. Confirm current use status with the Town before acquisition or design; Onslow Coastal Alliance (OCA) can coordinate a pre-application review.